+86 13600513715 0102030405
Municipal WWTP Winter Crisis: 5 Science-Backed Strategies for Stable Operation
2025-05-20
The Silent Threat: How 5°C Wrecks Urban WWTPs
Northern municipal plants face winter emergencies:
-
Ammonia spikes exceeding 8 mg/L
-
40% longer dewatering cycles
-
$12K/day penalties for TP violations
JUNTAI's 5-pillar solution combines biofilm engineering and waste heat recovery:

Pillar 1: Biofilm-Hybrid Reactors
-
Design: 70% suspended biomass + 30% carrier-bound nitrifiers
-
Performance:
-
82% NH3-N removal at 8°C (vs 48% in conventional AAO)
-
60% less sludge bulking
-
Pillar 2: Thermal Energy Harvesting
| Source | Recovery Rate | Temp Boost |
|---|---|---|
| Digester Gas | 85% | +4°C |
| Treated Effluent | 65% | +2°C |
| Combined Effect | - | +5°C |
Case: Beijing suburb plant achieved:
✅ 11°C bioreactor temp without external heating
✅ 28% energy cost reduction
Pillar 3: Dynamic SRT Control
-
Winter Protocol:
-
MLSS: 6,500 → 8,200 mg/L
-
SRT: 15 → 22 days
-
DO: 2.5 → 3.8 mg/L
-
-
Results:
-
Nitrifier population increased 3.2x
-
Filamentous bacteria suppressed by 70%
-
| Metric | Baseline | JUNTAI System |
|---|---|---|
| NH3-N at 6°C (mg/L) | 8.2 | 2.1 (-74%) |
| Dewatering Time (h) | 9.5 | 5.2 (-45%) |
| O&M Cost ($/ML) | 420 | 310 (-26%) |













